New Boiler Plant
Herschel “Woody” Williams Veterans Affairs Medical Center

Huntington, West Virginia

Project Scope: design a new n+1 fire tube boiler plant to support the demand of approximately 25,000 – 30,000 lbs/hr. during the coldest time period of the year integrated into the existing steam distribution system. The hillside location of the new plant was a challenging engineering, architecture and coordination effort. 